ASC Engineers, Inc.
Search Website
  • Home
  • About Us
    • Company Profile
    • Principal Engineer >
      • Profile
      • Credentials
      • Certificates
    • Civil/Structural Designer >
      • Profile
      • Credentials
  • Services
    • Civil Engineering
    • Structural Engineering
    • Construction Management
  • Projects
    • 2020 Projects
    • 2019 Projects
    • 2018 Projects
    • 2017 Projects
    • 2016 Projects
  • News
  • Contact Us
  • Careers
  • Gallery
  • Upload Files

Completed Projects


​Civil Design
  • New Parking Lot for Existing Apartment Buildings, Tumon, Guam
  • Northpoint Commercial Project, Yigo, Guam
  • Gavino Sewer Lines, Tamuning, Guam
  • Additional Parking of Sherwood Hotel, Guam
  • Sherwood Guam Drainage System Upgrade, Tumon, Guam
  • Sherwood Guam Environmental Assessment, Tumon, Guam
  • Guam Bakery New Industrial Building, Barrigada, Guam
  • Preliminary Sewer & Water System of Proposed NCS Housing, Dededo, Guam
  • Preliminary Sewer & Water System of Proposed Sun Plaza, Tumon, Guam
  • Preliminary Sewer & Water System of Proposed Special Event Center, Tumon, Guam
  • Preliminary Sewer & Water System of Proposed Portis Condominiums, Tumon, Guam
  • Preliminary Sewer & Water System of Proposed Manhattan Beach, Tumon, Guam
  • Preliminary Sewer & Water System Loads of Proposed Fountain Plaza Upgrade, Tumon, Guam
  • .... and many more

Structural Design
  • Structural Assessment of Sunhill Buildings, Tamuning, Guam
  • Seismic Evaluation of 9-story GITC Building, Tamuning, Guam
  • Design of three 20,000-gallon tanks and foundations at Ordot Dump Closure Construction
  • Structural Assessment of Mc Donalds, NCS, Dededo, Guam
  • Structural Assessment of 4 Metal Building Warehouses, Tamuning Industrial Park, Tamuning, Guam
  • Northpoint Commercial Project, Yigo, Guam
  • Scaffolding Work Platform Design, Strike South Ramp Utilities, Andersen Air Force Base, Guam
  • Pier and Abutment Formworks Design, Agana Bridge Replacement, Agana, Guam
  • Repair of Exterior Wall Framing, Sherwood Hotel, Guam
  • Southern High School Auditorium Structural Repairs, Sta. Rita, Guam
  • Guam Bakery New Industrial Building - Canopy Extension, Barrigada, Guam
  • Building 544 Awning Structural Design, Naval Base, Guam
  • Loading Dock and Canopy Expansion, Guam Bakery, Barrigada, Guam
  • 10'x20' LED Signage Structural Support, Tamuning, Guam
  • 146 AC Units Enclosure, Apra Housing, Naval Base Guam
  • Evaluation of Guam Power Authority (GPA) Platform, Dededo, Guam
  • Guam Bakery New Industrial Building, Barrigada, Guam
  • Evaluation of Three Pre-Engineered Water Tank Foundation, Layon Landfill, Talofofo, Guam
  • Chuck E Cheese's, Mezzanine Floor, Guam Premier Outlet, Tamuning, Guam
  • Bus Stop Waiting Shed, Guam Premier Outlet, Tamuning, Guam
  • CPS Warehouse, Mezzanine Floor, Harmon, Guam
  • Wind & Seismic Load Analysis for Cooling Tower, Naval Hospital
  • Evaporation Blow Unit Platform, Revenue & Taxation, Barrigada, Guam
  • Analysis of Existing Pre-Engineered Metal Building, Yigo, Guam
  • Contractor's Temporary Facility, Layon Landfill, Talofofo, Guam
  • More than 20 Residential Buildings
  • .... and many more

Note: The projects listed above DO NOT include those completed from 2000 through 2009. They are too many to be included in the list.

Go to Ongoing Projects Section
Copyright © 2020 ASC Engineers, Inc. All Rights Reserved.